Approved · unknownPasco County
UNICITY SOLAR ENERGY LLC project — 33-25-16
33-25-16
Load estimate pending
Lifecycle
Permitted as of Feb 25, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
UNICITY SOLAR ENERGY LLC project — 33-25-16
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
UNICITY SOLAR ENERGY LLC
Developer / Applicant
RIMOS THOMAS
Why this is a hauling opportunity: NOC — unclassified description: 33-25-16 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026035013 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
14.3 mi
Round trip
28.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 14.3 mi | 28.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 15.7 mi | 31.4 |
| quarry | Central State Aggregates LLC | Zephyrhill | 25.5 mi | 50.9 |
| quarry | Brooksville Quarry | Brooksville | 27.3 mi | 54.5 |
| quarry | Tampa Cement Grinding Plant | Tampa | 27.9 mi | 55.8 |
| quarry | Brooksville South Cement Plant | Brooksville | 28.1 mi | 56.1 |
| quarry | Calcium Plant | Jacksonville | 30.8 mi | 61.5 |
| quarry | Center Hill Mine | Brooksville | 34.6 mi | 69.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
RIMOS THOMAS
1 active project · Pasco
Contractor
UNICITY SOLAR ENERGY LLC
1 active project · Hillsborough
4515 George Rd suite 340 Tampa, FL 33634
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026035013 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/rimos-thomas-project-33-25-16-pasco-fl-4fcfccc6