A PLUS OVERHEAD GARAGE DOORS AND OPENERS project — 04-25-17

04-25-17

~628loads
fill dirt + base rock
4 wk
Lifecycle
Permitted as of May 15, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

A PLUS OVERHEAD GARAGE DOORS AND OPENERS project — 04-25-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
4.52 ac
Parcel 04-25-17-006A-00000-00E0
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
A PLUS OVERHEAD GARAGE DOORS AND OPENERS
Developer / Applicant
RILEY GLENN
Why this is a hauling opportunity: NOC — unclassified description: 04-25-17 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 4.5 ac disturbed, ~628 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 4.5 ac disturbed, ~628 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 4.5 ac disturbed, ~628 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 4.5 ac disturbed, ~628 est. loads (+20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026091144 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_04-25-17-006A-00000-00E0_00acf290 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_04-25-17-006A-00000-00E0_00acf290 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
7.0 mi
Round trip
13.9 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill7.0 mi13.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 8.0 mi16
quarryBrooksville QuarryBrooksville19.7 mi39.5
quarryBrooksville South Cement PlantBrooksville20.5 mi41
quarryCentral State Aggregates LLCZephyrhill21.2 mi42.4
quarryCalcium PlantJacksonville23.3 mi46.7
quarryCenter Hill MineBrooksville26.9 mi53.8
quarryTampa Cement Grinding PlantTampa29.6 mi59.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
RILEY GLENN
1 active project · Pasco
~628 est. loads · fill dirt
Contractor
A PLUS OVERHEAD GARAGE DOORS AND OPENERS

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260911442026-05-21Open ↗
fl_dor_cadastralFDOR_04-25-17-006A-00000-00E0_00acf2902026-05-28Open ↗
pascopaPASCOPA_04-25-17-006A-00000-00E0_00acf2902026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
04-25-17-006A-00000-00E0
Strap
04-25-17-006A-00000-00E0
Address
Acreage
4.52 ac
Sq ft
196,891
Owner of record
SHADOW RUN COMMUNITY
ASOCIATION INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/riley-glenn-project-04-25-17-pasco-fl-077c399c