Leads/r-double-a-builders-llc-project-sarasota-county-sarasota-fl-dbdc367f
Approved · unknownSarasota County

R DOUBLE A BUILDERS LLC project — Sarasota County

UN 193 TANGERINE WOODS PH 2

Load estimate pending
Lifecycle
Permitted as of Feb 29, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

R DOUBLE A BUILDERS LLC project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
6
Public records referencing this job
General Contractor
R DOUBLE A BUILDERS LLC
Developer / Applicant
MOORE IRENE F
The story

R DOUBLE A BUILDERS LLC is undertaking earthwork for a site development project at Tangerine Woods Phase 2 in Sarasota County, with permits now issued and active mobilization underway. This presents a strong hauling opportunity for excavation spoil, fill material, and site debris removal as grading and foundation prep begin. Contact R DOUBLE A BUILDERS LLC (prime GC) directly, with ownership stakeholders including Lamb Todd R, Algeri Joel, and Seward Mark for project decision-making.

Why this is a hauling opportunity: General contractor NOC: R DOUBLE A BUILDERS LLC | Connector base: 65 | Stage = permit_issued — actionable now (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2024027035 from sarasota_noc
  2. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2024027036 from sarasota_noc
  3. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2024027037 from sarasota_noc
  4. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2024027038 from sarasota_noc
  5. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2024027039 from sarasota_noc
  6. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2024027040 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Developer
MOORE IRENE F
Contractor
R DOUBLE A BUILDERS LLC
1 active project · Sarasota

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20240270352026-05-22Open ↗
sarasota_nocSarasota_20240270362026-05-22Open ↗
sarasota_nocSarasota_20240270372026-05-22Open ↗
sarasota_nocSarasota_20240270382026-05-22Open ↗
sarasota_nocSarasota_20240270392026-05-22Open ↗
sarasota_nocSarasota_20240270402026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/r-double-a-builders-llc-project-sarasota-county-sarasota-fl-dbdc367f