Leads/private-provider-inspections-install-24kw-generator-on-precast-pad-with-200amp-a-174eb623
Approved · unknownHillsborough County

*PRIVATE PROVIDER INSPECTIONS* INSTALL 24KW GENERATOR ON PRECAST PAD WITH 200AMP ATS. CONNECT NATURAL GAS TO GENERATOR

3808 W Barcelona St, T, 33629

~3loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

*PRIVATE PROVIDER INSPECTIONS* INSTALL 24KW GENERATOR ON PRECAST PAD WITH 200AMP ATS. CONNECT NATURAL GAS TO GENERATOR

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.027 ac
Parcel 1232890000
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
LP Gas Contractor LQ36425
Developer / Applicant
James Ayers Compton /Trustee
Why this is a hauling opportunity: Base unknown/other (20)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-23TAMPA_ACCELA
    Captured BLD-26-0526050 from tampa_accela
  2. 2026-06-23HCPA
    Captured HCPA_1232890000_e9ffaa6a from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
4.1 mi
Round trip
8.2 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa4.1 mi8.2
quarryCaloosa MaterialsRuskin15.7 mi31.3
quarryCentral State Aggregates LLCZephyrhill23.4 mi46.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 32.1 mi64.2
quarryFour CornersLithia34.5 mi69.1
sand pitCounty Line MineSpring Hill35.5 mi71
quarryWingate Creek MineLithia37.5 mi74.9
quarrySouth Pasture MineLithia39.2 mi78.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
James Ayers Compton /Trustee
Contractor
LP Gas Contractor LQ36425
3 active projects · Hillsborough
Applicant
GENERATOR SUPERCENTER OF TAMPA BAY
11 active projects · Hillsborough
~23,151 est. loads · fill dirt
📞 (813) 488-6030

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
tampa_accelaBLD-26-05260502026-06-23Open ↗
hcpaHCPA_1232890000_e9ffaa6a2026-06-23Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1232890000
Strap
A-33-29-18-3TP-000015-00007.0
Address
3808 W BARCELONA ST, TAMPA
Zip
33629
Acreage
0.027 ac
Sq ft
1,188
Homestead
YES
Owner of record
LYKES TYSON H II
LYKES GAIL P
Last sale
2023-07-10
$1,600,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/private-provider-inspections-install-24kw-generator-on-precast-pad-with-200amp-a-174eb623