Leads/pr-borrower-26-llc-project-14-26-16-pasco-fl-01ae048d
Approved · unknownPasco County

JBC GROUP INC project — 14-26-16

14-26-16

Load estimate pending
Lifecycle
Permitted as of May 21, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

JBC GROUP INC project — 14-26-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
JBC GROUP INC
Developer / Applicant
PR BORROWER 26 LLC
The story

PR BORROWER 26 LLC is executing a site development project at 14-26-16 with permit approval now issued, indicating imminent construction activity. While the project scope lacks detailed classification, the moderate hauling score of 65/100 suggests potential earthwork or material movement opportunities typical of site prep work. JBC GROUP INC (owner/developer) and PR BORROWER 26 LLC (GC) are the key contacts to engage immediately given the permit-issued stage—reach out now to lock in hauling contracts before mobilization begins.

Why this is a hauling opportunity: NOC — unclassified description: 14-26-16 | Connector base: 50 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026095169 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.8 mi
Round trip
31.6 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill15.8 mi31.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.9 mi31.8
quarryCentral State Aggregates LLCZephyrhill23.1 mi46.3
quarryTampa Cement Grinding PlantTampa24.4 mi48.8
quarryBrooksville QuarryBrooksville28.6 mi57.2
quarryBrooksville South Cement PlantBrooksville29.3 mi58.6
quarryCalcium PlantJacksonville32.2 mi64.4
quarryCenter Hill MineBrooksville35.7 mi71.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PR BORROWER 26 LLC
1 active project · Pasco
Contractor
JBC GROUP INC
5 active projects · Hillsborough

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260951692026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/pr-borrower-26-llc-project-14-26-16-pasco-fl-01ae048d