Leads/post-hurricane-debris-removal-seminole-tribe-of-florida-county-fl-seminole-tribe-a2dc14d0
Approved · unknownSeminole Tribe of Florida County

Post-Hurricane Debris Removal — Seminole Tribe of Florida County, FL

Seminole Tribe of Florida County, FL

Load estimate pending
Lifecycle
Permitted as of Nov 5, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Post-Hurricane Debris Removal — Seminole Tribe of Florida County, FL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 11/5/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

The story

Post-Hurricane Milton debris removal for Seminole Tribe of Florida County represents a high-volume, time-sensitive demolition and hauling opportunity with FEMA disaster declaration #4844 backing the project. With permits now issued and a 90/100 hauling score, this project is immediately actionable for debris hauling, vegetation removal, and potential material salvage operations. Contact the Seminole Tribe of Florida and local county authorities to secure contracts for equipment deployment, as disaster-funded projects typically have expedited timelines and guaranteed payment structures.

Why this is a hauling opportunity: FEMA disaster #4844 (Hurricane); declared as 'HURRICANE MILTON' | Connector base: 75 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22FEMA_DISASTERS
    Captured FEMA_4844_SEMINOLE_TRIBE_OF_FLORIDA from fema_disasters
  2. 2026-05-24FEMA_DISASTERS
    Captured FEMA_3623_SEMINOLE_TRIBE_OF_FLORIDA from fema_disasters

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
ANGELO'S RECYCLED MATERIALS - LARGO MRF · Largo
One-way
4.3 mi
Round trip
8.7 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
22.6 mi
Round trip
45.1 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa22.6 mi45.1
quarryCaloosa MaterialsRuskin23.8 mi47.6
quarryCentral State Aggregates LLCZephyrhill39.5 mi78.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 42.0 mi84
sand pitCounty Line MineSpring Hill43.1 mi86.1
quarryWingate Creek MineLithia47.5 mi95
landfillANGELO'S RECYCLED MATERIALS - LARGO MRFLargo4.3 mi8.7
transfer stationCLEARWATER MATERIALS TRANSFER FACILITYClearwater5.8 mi11.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fema_disastersFEMA_4844_SEMINOLE_TRIBE_OF_FLORIDA2026-05-22Open ↗
fema_disastersFEMA_3623_SEMINOLE_TRIBE_OF_FLORIDA2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
County
Seminole Tribe of Florida
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/post-hurricane-debris-removal-seminole-tribe-of-florida-county-fl-seminole-tribe-a2dc14d0