Leads/post-hurricane-debris-removal-miami-dade-county-fl-miami-dade-fl-e14a54c6
Approved · unknownMiami-Dade County

Post-Hurricane Debris Removal — Miami-Dade County, FL

Miami-Dade County, FL

Load estimate pending
Lifecycle
Permitted as of Oct 11, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Post-Hurricane Debris Removal — Miami-Dade County, FL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 10/11/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

The story

Miami-Dade County's post-Hurricane Milton debris removal project represents a high-priority FEMA disaster operation (DR-4834) with immediate hauling demand for mixed construction and vegetative debris across the county. With permits already issued, this is an actionable opportunity now for experienced demolition and disaster debris haulers capable of managing large-scale, time-sensitive municipal contracts. Target the Miami-Dade Public Works Department and FEMA-approved contractors managing the removal operation for equipment dispatch, labor availability, and competitive bidding on hauling contracts.

Why this is a hauling opportunity: FEMA disaster #4834 (Hurricane); declared as 'HURRICANE MILTON' | Connector base: 75 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22FEMA_DISASTERS
    Captured FEMA_4834_MIAMI-DADE from fema_disasters

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Epic Stoneworks, Inc. · Cutler Bay
One-way
7.9 mi
Round trip
15.8 mi
TypeNameCityOne-wayRT mi
quarryEpic Stoneworks, Inc.Cutler Bay7.9 mi15.8
quarryMiami QuarryJacksonville12.2 mi24.5
quarryFEC QUARRYMIAMI12.8 mi25.6
quarryPENNSUCO QUARRYMedley13.1 mi26.3
quarryPENNSUCO CEMENT PLANTMedley13.1 mi26.3
quarryMiami Cement PlantMiami14.3 mi28.6
quarryWHITE ROCK QUARRIESWest Palm Beach17.2 mi34.3
quarryKrome QuarryMIAMI19.0 mi38.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Miami-Dade County Permits
Search by address, folio, or permit number
ConnectorRecord IDCapturedLink
fema_disastersFEMA_4834_MIAMI-DADE2026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Miami-Dade
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/post-hurricane-debris-removal-miami-dade-county-fl-miami-dade-fl-e14a54c6