Leads/post-hurricane-debris-removal-brighton-indian-reservation-county-fl-brighton-ind-dd3e3136
Approved · unknownBrighton Indian Reservation County

Post-Hurricane Debris Removal — Brighton Indian Reservation County, FL

Brighton Indian Reservation County, FL

Load estimate pending
Lifecycle
Permitted as of Nov 5, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Post-Hurricane Debris Removal — Brighton Indian Reservation County, FL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 11/5/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

The story

Post-hurricane debris removal on Brighton Indian Reservation in Florida presents a high-priority hauling opportunity following Hurricane Milton (FEMA disaster #4844). This public works demolition project requires immediate debris hauling, material sorting, and likely landfill/recycling transport, with permit approval already in place for quick mobilization. Contact the Seminole Tribe of Florida and local county public works department to position for contract awards, as federal disaster funding typically enables rapid procurement for debris management services.

Why this is a hauling opportunity: FEMA disaster #4844 (Hurricane); declared as 'HURRICANE MILTON' | Connector base: 75 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22FEMA_DISASTERS
    Captured FEMA_4844_BRIGHTON_INDIAN_RESERVATION from fema_disasters
  2. 2026-05-24FEMA_DISASTERS
    Captured FEMA_3623_BRIGHTON_INDIAN_RESERVATION from fema_disasters

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

ConnectorRecord IDCapturedLink
fema_disastersFEMA_4844_BRIGHTON_INDIAN_RESERVATION2026-05-22Open ↗
fema_disastersFEMA_3623_BRIGHTON_INDIAN_RESERVATION2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
County
Brighton Indian Reservation
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/post-hurricane-debris-removal-brighton-indian-reservation-county-fl-brighton-ind-dd3e3136