PIPER FIRE PROTECTION LLC project — 11-26-19
11-26-19
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The Piper Fire Protection LLC project involves site development with a focus on utility installation, currently in the permitting stage at 11-26-19. This project presents a significant hauling opportunity due to the anticipated need for earthwork and materials transport as it advances to construction. Key contacts for this project include the general contractor Piper Fire Protection LLC and the owner-developer QTNS Group LLC, along with another co-developer, Urbanfoods LLC.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026025862 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2026018565 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 5.5 mi | 11 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 12.4 mi | 24.8 |
| sand pit | County Line Mine | Spring Hill | 17.9 mi | 35.8 |
| quarry | Tampa Cement Grinding Plant | Tampa | 21.1 mi | 42.2 |
| quarry | West Florida Aggregate | Webster | 23.9 mi | 47.8 |
| quarry | Brooksville Quarry | Brooksville | 24.3 mi | 48.6 |
| quarry | Brooksville South Cement Plant | Brooksville | 24.4 mi | 48.8 |
| quarry | Calcium Plant | Jacksonville | 27.7 mi | 55.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026025862 | 2026-05-21 | Open ↗ |
| pasco_noc | Pasco_2026018565 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/piper-fire-protection-llc-project-11-26-19-pasco-fl-787a995d