Leads/paree-joseph-michael-project-19-26-20-pasco-fl-0f9667e5
Approved · unknownPasco County

ISLAND WAY POOLS project — 19-26-20

19-26-20

Load estimate pending
Lifecycle
Permitted as of Mar 4, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

ISLAND WAY POOLS project — 19-26-20

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
ISLAND WAY POOLS
📞 (727) 488-2047
Developer / Applicant
PAREE JOSEPH MICHAEL
Why this is a hauling opportunity: NOC — unclassified description: 19-26-20 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026040782 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
3.0 mi
Round trip
6.1 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill3.0 mi6.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.2 mi30.4
quarryTampa Cement Grinding PlantTampa19.6 mi39.3
sand pitCounty Line MineSpring Hill20.7 mi41.4
quarryWest Florida AggregateWebster24.4 mi48.7
quarryBrooksville QuarryBrooksville26.7 mi53.3
quarryBrooksville South Cement PlantBrooksville26.7 mi53.4
quarryCalcium PlantJacksonville30.0 mi60
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PAREE JOSEPH MICHAEL
2 active projects · Pasco
Contractor
ISLAND WAY POOLS
1 active project · Pasco
📞 (727) 488-2047
People (12)
  • 18d2f96d279149989b95faf0a4b41882@sentry-next.wixpress.com✉︎
  • 2062d0a4929b45348643784b5cb39c36@sentry.wixpress.com✉︎
  • 271e9fa3230b4eec94b02bf95780f5f2@sentry.wixpress.com✉︎
  • 460ff4620fa44cba8df530afde949785@sentry.wixpress.com✉︎
  • 5d1795a2db124a268f1e1bd88f503500@sentry.wixpress.com✉︎
  • 605a7baede844d278b89dc95ae0a9123@sentry-next.wixpress.com✉︎
  • +6 more

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260407822026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/paree-joseph-michael-project-19-26-20-pasco-fl-0f9667e5