Approved · unknownLeon County
PANERA BREAD - APALACHEE PARKWAY
2009 APALACHEE PKWY, TALLAHASSEE, FL, 32301-4857
Load estimate pending
Lifecycle
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
PANERA BREAD - APALACHEE PARKWAY
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
PANERA BREAD - APALACHEE PARKWAY
Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21NPDES_STORMWATERCaptured FLR10UH53 from npdes_stormwater
- 2026-05-21NPDES_STORMWATERCaptured FLR10UG43 from npdes_stormwater
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest export sink (landfill)
CROWDER RECYCLING TRAM · Tallahassee
One-way
4.0 mi
Round trip
8 mi
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
10.3 mi
Round trip
20.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Silver Lake 1 | Tallahassee | 10.3 mi | 20.6 |
| quarry | Quincy Plant and Mines | QUINCY | 22.8 mi | 45.5 |
| quarry | Active Minerals Attapulgite Division | Quincy | 22.8 mi | 45.6 |
| sand pit | A-Mining Group II LLC. | Quincy | 24.3 mi | 48.7 |
| quarry | CYD Cabbage Grove | Daytona Beach | 25.6 mi | 51.2 |
| quarry | Perry Quarry | Fort Myers | 25.8 mi | 51.6 |
| quarry | SRM Materials Cabbage Grove | Lamont | 44.9 mi | 89.9 |
| landfill | CROWDER RECYCLING TRAM | Tallahassee | 4.0 mi | 8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
PANERA BREAD - APALACHEE PARKWAY
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| npdes_stormwater | FLR10UH53 | 2026-05-21 | Open ↗ |
| npdes_stormwater | FLR10UG43 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Leon
- City
- TALLAHASSEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/panera-bread-apalachee-parkway-leon-fl-7b1932d3