Leads/pace-center-for-girls-bradenton-manatee-fl-5ff47c85
Approved · unknownManatee County

PACE CENTER FOR GIRLS BRADENTON

3508 26TH ST W, BRADENTON, FL, 34205-3502

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

PACE CENTER FOR GIRLS BRADENTON

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
PACE CENTER FOR GIRLS BRADENTON
The story

The PACE Center for Girls Bradenton is a site development project focused on stormwater management, currently under construction at 3508 26th St W, Bradenton, FL. This project presents significant hauling opportunities due to its active construction phase and earthwork requirements, which indicate a robust demand for materials and excavation services. Key contacts include the PACE Center for Girls Bradenton, the owner-developer overseeing the project, making outreach crucial for hauling providers looking to engage in this timely opportunity.

Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR20HT72 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
3.9 mi
Round trip
7.8 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
18.5 mi
Round trip
37 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin18.5 mi37
quarryWingate Creek MineLithia28.6 mi57.1
quarryTampa Cement Grinding PlantTampa33.4 mi66.8
quarryFlorida Shell & Fill Company LLCNaples39.2 mi78.4
quarrySouth Pasture MineLithia41.1 mi82.2
quarryFour CornersLithia42.9 mi85.8
quarry4M-31 MineAlva48.1 mi96.2
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton3.9 mi7.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PACE CENTER FOR GIRLS BRADENTON

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR20HT722026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Manatee
City
BRADENTON
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/pace-center-for-girls-bradenton-manatee-fl-5ff47c85