Leads/nw-ward-5-manatee-fl-7afffe2c
Approved · unknownManatee County

NW WARD 5

11TH AVE W, BRADENTON, FL, 34205

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

NW WARD 5

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
NW WARD 5
The story

The NW WARD 5 project in Bradenton, FL is a site development initiative focused on stormwater management and is currently under construction. This project presents significant hauling opportunities due to strong earthwork signals tied to its active construction general permit, indicating a need for materials and earthmoving services. Key contacts include NW WARD 5 as the owner-developer, providing a direct line for hauling providers to align their services with the project's needs.

Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR20HG56 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
4.5 mi
Round trip
8.9 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
16.6 mi
Round trip
33.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin16.6 mi33.3
quarryWingate Creek MineLithia27.3 mi54.6
quarryTampa Cement Grinding PlantTampa31.7 mi63.3
quarrySouth Pasture MineLithia39.5 mi79.1
quarryFlorida Shell & Fill Company LLCNaples40.1 mi80.3
quarryFour CornersLithia41.2 mi82.4
quarry4M-31 MineAlva47.6 mi95.2
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton4.5 mi8.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Manatee County Permits
Bradenton / Palmetto Building & Dev Services
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR20HG562026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Manatee
City
BRADENTON
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/nw-ward-5-manatee-fl-7afffe2c