Leads/new-wave-aluminum-project-hillsborough-county-hillsborough-fl-9127a4d8
Approved · unknownHillsborough County

NOC – Miller Robert / Miller Renee A | New Wave Aluminum | 2122 Acadia Greens Dr

2122 Acadia Greens Dr, Sun City Center, FL 33573

~1loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Feb 17, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Miller Robert / Miller Renee A | New Wave Aluminum | 2122 Acadia Greens Dr

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.006 ac
Parcel 0574744974
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
NEW WAVE ALUMINUM
📞 (813) 659-6342
Developer / Applicant
MILLER ROBERT
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; Window room | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2026061160 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_0574744974_37e4d407 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
4.5 mi
Round trip
9 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin4.5 mi9
quarryTampa Cement Grinding PlantTampa17.5 mi34.9
quarryWingate Creek MineLithia20.0 mi40
quarryFour CornersLithia24.7 mi49.5
quarrySouth Pasture MineLithia25.9 mi51.7
quarryCentral State Aggregates LLCZephyrhill35.6 mi71.3
quarrySouth Fort Meade MineLithia37.6 mi75.1
quarry4M-31 MineAlva45.5 mi91
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
MILLER ROBERT
Contractor
NEW WAVE ALUMINUM
8 active projects · Hillsborough
~20 est. loads · fill dirt
📞 (813) 659-6342

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20260611602026-05-21Open ↗
hcpaHCPA_0574744974_37e4d4072026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0574744974
Strap
U-14-32-19-5NI-000000-00037.0
Address
2122 ACADIA GREENS DR, SUN CITY CENTER
Zip
33573
Acreage
0.006 ac
Sq ft
278
Homestead
NO
Owner of record
MILLER ROBERT
MILLER RENEE A
Last sale
2025-10-27
$100(transfer)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/new-wave-aluminum-project-hillsborough-county-hillsborough-fl-9127a4d8