NOC – Crown Castle (cell tower owner) | New-Tech Construction | Add or replace antennas, ancillary equipment and ground equi
Hillsborough, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Crown Castle is upgrading wireless infrastructure at their Hillsborough, FL cell tower site through New-Tech Construction, involving antenna and ground equipment replacement—a permitted project with solid hauling demand for equipment staging, debris removal, and potential excavation work. With a 75/100 hauling score, this represents a reliable opportunity for material haul-off and site logistics support. Contact New-Tech Construction (prime GC) to discuss earthwork, equipment transport, and debris management services for this active telecom facility upgrade.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025445824 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2025445824 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 088855-0000
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/new-tech-construction-project-hillsborough-county-hillsborough-fl-eb4fedef