Leads/murray-barbara-project-31-25-16-pasco-fl-0347c8d9
Approved · unknownPasco County

XPRESS EXTERIOR DESIGN LLC project — 31-25-16

31-25-16

~347loads
fill dirt + base rock
2 wk
Lifecycle
Permitted as of Jun 16, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

XPRESS EXTERIOR DESIGN LLC project — 31-25-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$427K
Actual — from source record
Acreage
2.5 ac
Parcel 31-25-16-0040-03400-0020
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
XPRESS EXTERIOR DESIGN
Developer / Applicant
RATHBONE CYNTHIA LEE
Why this is a hauling opportunity: NOC — unclassified description: 31-25-16 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 2.5 ac disturbed, ~347 est. loads (+12) | size signal: 2.5 ac disturbed, ~347 est. loads (+12) | size signal: 2.5 ac disturbed, $427,451 valuation, ~347 est. loads (+12) | size signal: 2.5 ac disturbed, $427,451 valuation, ~347 est. loads (+12)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2023109267 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_31-25-16-0040-03400-0020_6bfd23b1 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_31-25-16-0040-03400-0020_6bfd23b1 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.5 mi
Round trip
31 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill15.5 mi31
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.3 mi34.6
quarryCentral State Aggregates LLCZephyrhill27.3 mi54.6
quarryBrooksville QuarryBrooksville28.4 mi56.8
quarryTampa Cement Grinding PlantTampa29.0 mi58
quarryBrooksville South Cement PlantBrooksville29.3 mi58.5
quarryCalcium PlantJacksonville31.8 mi63.7
quarryCenter Hill MineBrooksville35.9 mi71.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
RATHBONE CYNTHIA LEE
Contractor
XPRESS EXTERIOR DESIGN
13 active projects · Pasco
~347 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20231092672026-05-21Open ↗
fl_dor_cadastralFDOR_31-25-16-0040-03400-0020_6bfd23b12026-05-28Open ↗
pascopaPASCOPA_31-25-16-0040-03400-0020_6bfd23b12026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
31-25-16-0040-03400-0020
Strap
31-25-16-0040-03400-0020
Address
4606 LIMIT DRIVE, NEW PORT RICHEY
Zip
34652
Acreage
2.5 ac
Sq ft
108,900
Owner of record
RATHBONE CYNTHIA LEE
Last sale

No sale on record

Appraiser valuation
Just (market)
$418,950

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/murray-barbara-project-31-25-16-pasco-fl-0347c8d9