Leads/montalvo-alexander-project-19-26-19-pasco-fl-b760d7a9
Approved · unknownPasco County

QUICK QUOTE ROOFING project — 19-26-19

19-26-19

~46loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Jul 9, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

QUICK QUOTE ROOFING project — 19-26-19

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$473K
Actual — from source record
Acreage
0.33 ac
Parcel 19-26-19-0520-00000-3540
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
QUICK QUOTE ROOFING
Developer / Applicant
FRANCO KELLY
Why this is a hauling opportunity: NOC — unclassified description: 19-26-19 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: (+6) | stage=permit_issued, recent (+10) | size signal: $472,997 valuation, ~46 est. loads (+6) | stage=permit_issued, recent (+10) | size signal: $472,997 valuation, ~46 est. loads (+6) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025131239 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_19-26-19-0520-00000-3540_8bb83bb3 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_19-26-19-0520-00000-3540_8bb83bb3 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
9.1 mi
Round trip
18.1 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill9.1 mi18.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 12.7 mi25.4
sand pitCounty Line MineSpring Hill17.3 mi34.7
quarryTampa Cement Grinding PlantTampa18.7 mi37.4
quarryBrooksville QuarryBrooksville26.0 mi52
quarryBrooksville South Cement PlantBrooksville26.3 mi52.5
quarryWest Florida AggregateWebster28.0 mi56
quarryCalcium PlantJacksonville29.6 mi59.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
FRANCO KELLY
Contractor
QUICK QUOTE ROOFING
1 active project · Hillsborough

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20251312392026-05-21Open ↗
fl_dor_cadastralFDOR_19-26-19-0520-00000-3540_8bb83bb32026-05-28Open ↗
pascopaPASCOPA_19-26-19-0520-00000-3540_8bb83bb32026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
19-26-19-0520-00000-3540
Strap
19-26-19-0520-00000-3540
Address
3540 EAST LAKE DRIVE, LAND O LAKES
Zip
34639
Acreage
0.33 ac
Sq ft
14,375
Owner of record
FRANCO KELLY
Last sale

No sale on record

Appraiser valuation
Just (market)
$484,587

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/montalvo-alexander-project-19-26-19-pasco-fl-b760d7a9