Leads/mattamy-tampa-sarasota-llc-project-sarasota-county-sarasota-fl-2dfc66a4
Approved · unknownSarasota County

MATTAMY TAMPA SARASOTA LLC project — Sarasota County

2021084141 TERMINATION

Load estimate pending
Lifecycle
Permitted as of Sep 2, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

MATTAMY TAMPA SARASOTA LLC project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 9/2/2021 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
MATTAMY TAMPA SARASOTA LLC
Why this is a hauling opportunity: NOC with no description — unknown scope | Connector base: 50 | Stage = permit_issued — actionable now (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2021161220 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Developer
MATTAMY TAMPA SARASOTA LLC
1 active project · Pasco

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20211612202026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/mattamy-tampa-sarasota-llc-project-sarasota-county-sarasota-fl-2dfc66a4