Leads/m-i-homes-project-07-25-21-pasco-fl-d51ccffc
Approved · unknownPasco County

UPLIFTING AIR LLC project — 07-25-21

07-25-21

~529loads
fill dirt + base rock
4 wk
Lifecycle
Permitted as of Apr 16, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

UPLIFTING AIR LLC project — 07-25-21

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$5K
Actual — from source record
Acreage
3.81 ac
Parcel 07-25-21-0000-49900-0010
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
UPLIFTING AIR LLC
Developer / Applicant
M I HOMES
Why this is a hauling opportunity: NOC — unclassified description: 07-25-21 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 3.8 ac disturbed, ~529 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 3.8 ac disturbed, ~529 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 3.8 ac disturbed, ~529 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 3.8 ac disturbed, ~529 est. loads (+20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026070487 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_07-25-21-0000-49900-0010_67114af4 from fl_dor_cadastral
  3. 2026-06-01PASCOPA
    Captured PASCOPA_07-25-21-0000-49900-0010_67114af4 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
8.8 mi
Round trip
17.6 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill8.8 mi17.6
quarryWest Florida AggregateWebster14.3 mi28.7
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.5 mi30.9
sand pitCounty Line MineSpring Hill21.1 mi42.2
quarryBrooksville South Cement PlantBrooksville21.2 mi42.5
quarryBrooksville QuarryBrooksville21.6 mi43.1
quarryCenter Hill MineBrooksville23.1 mi46.2
quarryCalcium PlantJacksonville24.2 mi48.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
M I HOMES
2 active projects · Pasco
~529 est. loads · fill dirt
Contractor
UPLIFTING AIR LLC
1 active project · Pasco
12231 Main Street Unit 1196 San Antonio, FL 33576

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260704872026-05-21Open ↗
fl_dor_cadastralFDOR_07-25-21-0000-49900-0010_67114af42026-05-28Open ↗
pascopaPASCOPA_07-25-21-0000-49900-0010_67114af42026-06-01Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
07-25-21-0000-49900-0010
Strap
07-25-21-0000-49900-0010
Address
Acreage
3.81 ac
Sq ft
165,964
Owner of record
PASCO COUNTY
C/O FACILITIES MANAGEMENT DEPARTMENT
Last sale

No sale on record

Appraiser valuation
Just (market)
$3,810

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/m-i-homes-project-07-25-21-pasco-fl-d51ccffc