Approved · unknownPasco County
LRE FOUNDATION REPAIR LLC project — 30-26-17
30-26-17
Load estimate pending
Lifecycle
Permitted as of Apr 28, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
LRE FOUNDATION REPAIR LLC project — 30-26-17
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
Developer / Applicant
JOHNSON DAWN
Why this is a hauling opportunity: Hauling-likely contractor: LRE FOUNDATION REPAIR LLC | Connector base: 70 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026077766 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
16.2 mi
Round trip
32.4 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 16.2 mi | 32.4 |
| sand pit | County Line Mine | Spring Hill | 17.0 mi | 34 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.1 mi | 42.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 21.6 mi | 43.2 |
| quarry | Brooksville Quarry | Brooksville | 29.5 mi | 58.9 |
| quarry | Brooksville South Cement Plant | Brooksville | 30.1 mi | 60.2 |
| quarry | Calcium Plant | Jacksonville | 33.1 mi | 66.3 |
| quarry | Caloosa Materials | Ruskin | 36.1 mi | 72.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
JOHNSON DAWN
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026077766 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/lre-foundation-repair-llc-project-30-26-17-pasco-fl-6717fb80