Approved · unknownPasco County
LRE FOUNDATION REPAIR LLC project — 27-24-21
27-24-21
Load estimate pending
Lifecycle
Permitted as of Apr 28, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
LRE FOUNDATION REPAIR LLC project — 27-24-21
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
Developer / Applicant
JOHNSON JESSE
Why this is a hauling opportunity: Hauling-likely contractor: LRE FOUNDATION REPAIR LLC | Connector base: 70 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026077767 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
West Florida Aggregate · Webster
One-way
10.3 mi
Round trip
20.6 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | West Florida Aggregate | Webster | 10.3 mi | 20.6 |
| quarry | Central State Aggregates LLC | Zephyrhill | 12.8 mi | 25.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 17.9 mi | 35.8 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 20.1 mi | 40.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 20.6 mi | 41.2 |
| quarry | Brooksville Quarry | Brooksville | 21.1 mi | 42.3 |
| quarry | Center Hill Mine | Brooksville | 21.2 mi | 42.5 |
| sand pit | County Line Mine | Spring Hill | 23.2 mi | 46.3 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
JOHNSON JESSE
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026077767 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/lre-foundation-repair-llc-project-27-24-21-pasco-fl-a51f999e