LIU YUFEI project — 21-25-16
21-25-16
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025189087 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2025164555 from pasco_noc
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_21-25-16-0010-01400-0000_34475fb6 from fl_dor_cadastral
- 2026-06-08PASCOPACaptured PASCOPA_21-25-16-0010-01400-0000_34475fb6 from pascopa
- 2026-06-27FL_DOR_CADASTRALCaptured FDOR_21-25-16-0010-01400-0000_495d68a1 from fl_dor_cadastral
- 2026-06-29PASCOPACaptured PASCOPA_21-25-16-0010-01400-0000_495d68a1 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 12.7 mi | 25.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 14.7 mi | 29.5 |
| quarry | Brooksville Quarry | Brooksville | 25.7 mi | 51.4 |
| quarry | Central State Aggregates LLC | Zephyrhill | 25.9 mi | 51.7 |
| quarry | Brooksville South Cement Plant | Brooksville | 26.5 mi | 53 |
| quarry | Calcium Plant | Jacksonville | 29.1 mi | 58.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 29.6 mi | 59.1 |
| quarry | Center Hill Mine | Brooksville | 33.1 mi | 66.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025189087 | 2026-05-21 | Open ↗ |
| pasco_noc | Pasco_2025164555 | 2026-05-21 | Open ↗ |
| fl_dor_cadastral | FDOR_21-25-16-0010-01400-0000_34475fb6 | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_21-25-16-0010-01400-0000_34475fb6 | 2026-06-08 | Open ↗ |
| fl_dor_cadastral | FDOR_21-25-16-0010-01400-0000_495d68a1 | 2026-06-27 | Open ↗ |
| pascopa | PASCOPA_21-25-16-0010-01400-0000_495d68a1 | 2026-06-29 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 21-25-16-0010-01400-0000
- Strap
- 21-25-16-0010-01400-0000
- Address
- 9446 US HIGHWAY 19, PORT RICHEY
- Zip
- 34668
- Acreage
- 9.35 ac
- Sq ft
- 407,286
No sale on record
- Just (market)
- $3,229,924
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/liu-yufei-project-21-25-16-pasco-fl-98c19324