LIHTC — WEST DADE I
1077 NW 45TH AVE, MIAMI, FL, 33126
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/1/1988 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28HUD_LIHTCCaptured HUD_LIHTC_FLA00000740 from hud_lihtc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Epic Stoneworks, Inc. | Cutler Bay | 3.3 mi | 6.5 |
| quarry | Miami Quarry | Jacksonville | 7.4 mi | 14.7 |
| quarry | FEC QUARRY | MIAMI | 8.7 mi | 17.5 |
| quarry | PENNSUCO QUARRY | Medley | 9.0 mi | 17.9 |
| quarry | PENNSUCO CEMENT PLANT | Medley | 9.0 mi | 17.9 |
| quarry | Miami Cement Plant | Miami | 9.5 mi | 18.9 |
| quarry | WHITE ROCK QUARRIES | West Palm Beach | 13.4 mi | 26.8 |
| quarry | Krome Quarry | MIAMI | 14.8 mi | 29.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| hud_lihtc | HUD_LIHTC_FLA00000740 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Miami-Dade
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lihtc-west-dade-i-miami-dade-fl-748bc19a