LIHTC — SUNSHINE 102
4711 14TH AVE S, ST PETERSBURG, FL, 33711
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/1/1988 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28HUD_LIHTCCaptured HUD_LIHTC_FLA00000690 from hud_lihtc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 16.2 mi | 32.5 |
| quarry | Tampa Cement Grinding Plant | Tampa | 19.9 mi | 39.9 |
| quarry | Wingate Creek Mine | Lithia | 39.5 mi | 78.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 39.5 mi | 78.9 |
| quarry | Four Corners | Lithia | 44.5 mi | 89 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 45.3 mi | 90.5 |
| quarry | South Pasture Mine | Lithia | 46.6 mi | 93.1 |
| sand pit | County Line Mine | Spring Hill | 47.3 mi | 94.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| hud_lihtc | HUD_LIHTC_FLA00000690 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pinellas
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lihtc-sunshine-102-pinellas-fl-254e04c3