LIHTC — SPINNAKER LANDING
1600 W 16TH ST, RIVIERA BEACH, FL, 33404
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/1/1989 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28HUD_LIHTCCaptured HUD_LIHTC_FLA00000580 from hud_lihtc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Palm Beach Aggregates LLC | Jacksonville | 18.3 mi | 36.5 |
| sand pit | Palm City Mine | Greenacres | 25.2 mi | 50.3 |
| sand pit | MC320 Mine | Palm City | 26.7 mi | 53.4 |
| quarry | 1412 Canal Point | Hammond | 33.5 mi | 67 |
| quarry | Five Stones Mine, LLC. | Tinton Falls | 34.8 mi | 69.6 |
| quarry | Star Quarries | SOUTH BAY | 40.9 mi | 81.8 |
| quarry | Fort Pierce Mine | Jacksonville | 42.8 mi | 85.7 |
| transfer station | NATIONAL RECYCLING GROUP | Riviera Beach | 0.7 mi | 1.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| hud_lihtc | HUD_LIHTC_FLA00000580 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Palm Beach
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lihtc-spinnaker-landing-palm-beach-fl-9b60bb4d