LIHTC — PARK AT PALM BAY
90 SAN FILIPPO, PALM BAY, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/1/2002 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28HUD_LIHTCCaptured HUD_LIHTC_FLA20020150 from hud_lihtc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Brisbane Pit | Fellsmere | 9.5 mi | 18.9 |
| sand pit | Sunshine Mine | Fort Pierce | 10.5 mi | 20.9 |
| quarry | Buck Hammock | Orlando | 17.7 mi | 35.3 |
| sand pit | Vero Rock and Sand | Vero Beach | 20.3 mi | 40.7 |
| sand pit | Blue Goose Mine | Fort Pierce | 21.1 mi | 42.1 |
| quarry | Capron Trails Mine | Jupiter | 32.9 mi | 65.8 |
| quarry | Rock Solid Rock, LLC | Titusville | 35.3 mi | 70.6 |
| quarry | S & L Materials Inc | KISSIMMEE | 40.8 mi | 81.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| hud_lihtc | HUD_LIHTC_FLA20020150 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Brevard
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lihtc-park-at-palm-bay-brevard-fl-769bc468