LIHTC — OVIEDO TOWN CENTRE IV
450 FONTANA CIR, OVIEDO, FL, 32765
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/1/2008 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28HUD_LIHTCCaptured HUD_LIHTC_FLA20080190 from hud_lihtc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Beeline Mine | Orlando | 16.6 mi | 33.1 |
| quarry | S & L Materials Inc | KISSIMMEE | 17.5 mi | 35.1 |
| quarry | Rock Solid Rock, LLC | Titusville | 26.8 mi | 53.5 |
| sand pit | Center Sand Company | Clermont | 31.6 mi | 63.1 |
| sand pit | Independent Mine | Davenport | 32.0 mi | 64.1 |
| sand pit | Astatula Sand Plant | Jacksonville | 32.4 mi | 64.9 |
| sand pit | Four Corners Sand Mine | Brooksville | 33.1 mi | 66.2 |
| sand pit | Hilochee Sand Mine | Davenport | 36.5 mi | 73 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| hud_lihtc | HUD_LIHTC_FLA20080190 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Seminole
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lihtc-oviedo-town-centre-iv-seminole-fl-fd603a5e