Leads/lihtc-hampton-point-charlotte-fl-d3916e0c
Approved · unknownCharlotte County

LIHTC — HAMPTON POINT

2511 LUTHER RD, PORT CHARLOTTE, FL, 33983

Load estimate pending
Lifecycle
Permitted as of Jan 1, 2005
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

LIHTC — HAMPTON POINT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/1/2005 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base mixed_use/vertical_build (40) | stage=permit_issued, but stale (21y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28HUD_LIHTC
    Captured HUD_LIHTC_FLA20050070 from hud_lihtc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Washington Loop Mine · Punta Gorda
One-way
5.1 mi
Round trip
10.2 mi
TypeNameCityOne-wayRT mi
sand pitWashington Loop MinePunta Gorda5.1 mi10.2
quarryBermont Materials AlicoPunta Gorda6.7 mi13.3
quarryHalls MineNaples15.7 mi31.4
sand pitWatermelon PitPunta Gorda16.5 mi33
quarryHighlands County Shell PitSebring16.8 mi33.6
quarryWright Farms PitNocatee16.9 mi33.8
sand pitWillliams Farms Sand & Shell, Inc.PUNTA GORDA16.9 mi33.9
quarry4M-31 MineAlva18.0 mi36
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Charlotte County Permits
Port Charlotte Building Construction
ConnectorRecord IDCapturedLink
hud_lihtcHUD_LIHTC_FLA200500702026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Charlotte
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/lihtc-hampton-point-charlotte-fl-d3916e0c