Leads/leslie-aaron-project-6-24-21-pasco-fl-4eb34020
Approved · unknownPasco County

LESLIE AARON project — 6-24-21

6-24-21

~1.4kloads
fill dirt + base rock
9 wk
Lifecycle
Permitted as of Aug 20, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

LESLIE AARON project — 6-24-21

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$10K
Actual — from source record
Acreage
9.99 ac
Parcel 06-24-21-0000-49900-0030
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
LESLIE AARON
Developer / Applicant
PASCO COUNTY
Why this is a hauling opportunity: NOC — unclassified description: 6-24-21 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 10.0 ac disturbed, ~1388 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 10.0 ac disturbed, ~1388 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 10.0 ac disturbed, ~1388 est. loads (+20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025159122 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_06-24-21-0000-49900-0030_e12f568a from fl_dor_cadastral
  3. 2026-06-01PASCOPA
    Captured PASCOPA_06-24-21-0000-49900-0030_e12f568a from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
West Florida Aggregate · Webster
One-way
8.8 mi
Round trip
17.5 mi
TypeNameCityOne-wayRT mi
quarryWest Florida AggregateWebster8.8 mi17.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.1 mi30.2
quarryBrooksville South Cement PlantBrooksville15.6 mi31.3
quarryCentral State Aggregates LLCZephyrhill15.6 mi31.3
quarryBrooksville QuarryBrooksville16.2 mi32.4
quarryCenter Hill MineBrooksville16.4 mi32.7
quarryCalcium PlantJacksonville18.2 mi36.4
quarryMid-Coast Aggregates LLC-Mazak MineWebster19.6 mi39.1
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PASCO COUNTY
1 active project · Pasco
Pasco County, FL, USA
Contractor
LESLIE AARON
1 active project · Pasco
~1,388 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20251591222026-05-21Open ↗
fl_dor_cadastralFDOR_06-24-21-0000-49900-0030_e12f568a2026-05-28Open ↗
pascopaPASCOPA_06-24-21-0000-49900-0030_e12f568a2026-06-01Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
06-24-21-0000-49900-0030
Strap
06-24-21-0000-49900-0030
Address
Acreage
9.99 ac
Sq ft
435,164
Owner of record
PASCO COUNTY
C/O FACILITIES MANAGEMENT DEPARTMENT
Last sale

No sale on record

Appraiser valuation
Just (market)
$9,990

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/leslie-aaron-project-6-24-21-pasco-fl-4eb34020