Approved · unknownSarasota County
KOEGEL RAYMOND project — Sarasota County
1524 SOUTHBAY DR OSPREY
Load estimate pending
Lifecycle
Permitted as of Mar 3, 2022
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
KOEGEL RAYMOND project — Sarasota County
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Not yet identified
Developer / Applicant
KOEGEL RAYMOND
Why this is a hauling opportunity: NOC with no description — unknown scope | Connector base: 50 | Stage = permit_issued — actionable now (+10) | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22SARASOTA_NOCCaptured Sarasota_2022036163 from sarasota_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
18.0 mi
Round trip
35.9 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Florida Shell & Fill Company LLC | Naples | 18.0 mi | 35.9 |
| quarry | Wingate Creek Mine | Lithia | 31.4 mi | 62.8 |
| sand pit | Washington Loop Mine | Punta Gorda | 35.8 mi | 71.7 |
| quarry | Caloosa Materials | Ruskin | 36.5 mi | 73.1 |
| quarry | Bermont Materials Alico | Punta Gorda | 37.4 mi | 74.8 |
| quarry | 4M-31 Mine | Alva | 38.3 mi | 76.5 |
| sand pit | Watermelon Pit | Punta Gorda | 45.9 mi | 91.8 |
| quarry | Halls Mine | Naples | 46.2 mi | 92.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
KOEGEL RAYMOND
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| sarasota_noc | Sarasota_2022036163 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/koegel-raymond-project-sarasota-county-sarasota-fl-e2264a32