QUICK QUOTE ROOFING project — 03-25-17
03-25-17
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025136327 from pasco_noc
- 2026-05-22PASCO_NOCCaptured Pasco_2026074084 from pasco_noc
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_03-25-17-0070-0B100-0000_2a1f0ba2 from fl_dor_cadastral
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_03-25-17-0070-0B100-0000_05651aa3 from fl_dor_cadastral
- 2026-06-01PASCOPACaptured PASCOPA_03-25-17-0070-0B100-0000_2a1f0ba2 from pascopa
- 2026-06-08PASCOPACaptured PASCOPA_03-25-17-0070-0B100-0000_05651aa3 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 6.7 mi | 13.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 7.1 mi | 14.2 |
| quarry | Brooksville Quarry | Brooksville | 19.2 mi | 38.5 |
| quarry | Brooksville South Cement Plant | Brooksville | 19.9 mi | 39.9 |
| quarry | Central State Aggregates LLC | Zephyrhill | 20.3 mi | 40.6 |
| quarry | Calcium Plant | Jacksonville | 22.9 mi | 45.8 |
| quarry | Center Hill Mine | Brooksville | 26.3 mi | 52.6 |
| quarry | Tampa Cement Grinding Plant | Tampa | 29.2 mi | 58.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025136327 | 2026-05-21 | Open ↗ |
| pasco_noc | Pasco_2026074084 | 2026-05-22 | Open ↗ |
| fl_dor_cadastral | FDOR_03-25-17-0070-0B100-0000_2a1f0ba2 | 2026-05-28 | Open ↗ |
| fl_dor_cadastral | FDOR_03-25-17-0070-0B100-0000_05651aa3 | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_03-25-17-0070-0B100-0000_2a1f0ba2 | 2026-06-01 | Open ↗ |
| pascopa | PASCOPA_03-25-17-0070-0B100-0000_05651aa3 | 2026-06-08 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 03-25-17-0070-0B100-0000
- Strap
- 03-25-17-0070-0B100-0000
- Address
- Acreage
- 150.63 ac
- Sq ft
- 6,561,443
No sale on record
- Just (market)
- $0
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/kirkland-lyndon-project-03-25-17-pasco-fl-17698d46