Leads/keefe-patrick-project-sarasota-county-sarasota-fl-c9189423
Approved · unknownSarasota County

KEEFE PATRICK project — Sarasota County

3914 HADDEN TER NORTH PORT

Load estimate pending
Lifecycle
Permitted as of Jun 4, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

KEEFE PATRICK project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 6/4/2021 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
KEEFE PATRICK
Why this is a hauling opportunity: NOC with no description — unknown scope | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2021104208 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
11.5 mi
Round trip
23 mi
TypeNameCityOne-wayRT mi
quarryFlorida Shell & Fill Company LLCNaples11.5 mi23
sand pitWashington Loop MinePunta Gorda16.9 mi33.8
quarryBermont Materials AlicoPunta Gorda18.4 mi36.8
quarry4M-31 MineAlva23.8 mi47.7
quarryHalls MineNaples27.4 mi54.8
sand pitWatermelon PitPunta Gorda27.7 mi55.3
quarryHighlands County Shell PitSebring28.4 mi56.7
quarryWright Farms PitNocatee28.4 mi56.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
KEEFE PATRICK

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20211042082026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/keefe-patrick-project-sarasota-county-sarasota-fl-c9189423