Approved · unknownHillsborough County
Install Kohler 26KW on an aluminum Cantilevered stand & line from existing NG meter
563 Suwanee Cir, T, 33606
~4loads
fill dirt
≤1 wk
Lifecycle
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
Install Kohler 26KW on an aluminum Cantilevered stand & line from existing NG meter
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
0.039 ac
Parcel 1957550000
Est truck loads
—
Needs site plan parse
Sources seen
3
Public records referencing this job
Why this is a hauling opportunity: Base unknown/other (20)
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-23TAMPA_ACCELACaptured BLD-26-0525333 from tampa_accela
- 2026-05-25HCPACaptured HCPA_1957550000_4cbe138b from hcpa
- 2026-05-25HCPACaptured HCPA_1957550000_567d3db0 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
1.5 mi
Round trip
2.9 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 1.5 mi | 2.9 |
| quarry | Caloosa Materials | Ruskin | 14.9 mi | 29.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 22.0 mi | 44 |
| quarry | Four Corners | Lithia | 31.5 mi | 63 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 32.4 mi | 64.8 |
| quarry | Wingate Creek Mine | Lithia | 35.4 mi | 70.8 |
| sand pit | County Line Mine | Spring Hill | 36.2 mi | 72.4 |
| quarry | South Pasture Mine | Lithia | 36.3 mi | 72.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Contractor
PRIVATE PROVIDER - INNOVATIVE CONSTRUCTION INSPECTION INC
3 active projects · Hillsborough
~12 est. loads · fill dirt
Permits & Sources
Every connector that's seen this project
Official source-of-truth portal
Hillsborough County Permits ↗Tampa area permits, inspections, reviews
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| tampa_accela | BLD-26-0525333 | 2026-05-23 | Open ↗ |
| hcpa | HCPA_1957550000_4cbe138b | 2026-05-25 | Open ↗ |
| hcpa | HCPA_1957550000_567d3db0 | 2026-05-25 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
PropertyHCPA ↗
- Folio
- 1957550000
- Strap
- A-36-29-18-509-000069-00035.0
- Address
- 563 SUWANEE CIR, TAMPA
- Zip
- 33606
- Acreage
- 0.039 ac
- Sq ft
- 1,719
- Homestead
- NO
Owner of record
BOKSEN BRIAN
BOKSEN JESSICA
Last sale
2017-11-13
$1,350,000
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/install-kohler-26kw-on-an-aluminum-cantilevered-stand-line-from-existing-ng-mete-9eb96e09