MG BUILDING SOLUTIONS project — L2 B 35 MAC FARLANES REV MAP OF ADD TO W TAMPA
Hillsborough, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Michael Sweeney's roof replacement project in Hillsborough, FL presents a solid hauling opportunity with a 75/100 score, primarily driven by the filed NOC (Notice of Commencement) confirming project legitimacy. While classified as roof work, the earthwork designation and permit-issued stage suggest potential debris removal, roofing material haul-off, and waste disposal needs typical of renovation projects. Contact ICONTRACTING (prime GC) at (855) 684-7663 or reach out directly to owner Michael Sweeney to pitch roll-off dumpsters, material hauling, and demolition waste services.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025365993 from official_records_noc
- 2026-07-02OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025539470 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2025365993 | 2026-05-21 | Open ↗ |
| official_records_noc | Hillsborough_2025539470 | 2026-07-02 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 054300-0000
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/icontracting-project-l-6-b-n-del-webbs-sun-city-fl-10-hillsborough-fl-8ab18de5