NOC – Richard B Tom lirsen | LRE FOUNDATION REPAIR, LLC - Frank Vitale | 504 Sunset Dr
504 Sunset Dr, Brandon, FL 33511
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2023301021 from official_records_noc
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2023193539 from official_records_noc
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2022284217 from official_records_noc
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2022231118 from official_records_noc
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2022171321 from official_records_noc
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2022141991 from official_records_noc
- 2026-07-04OFFICIAL_RECORDS_NOCCaptured Hillsborough_2022078704 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 9.2 mi | 18.5 |
| quarry | Caloosa Materials | Ruskin | 17.8 mi | 35.7 |
| quarry | Central State Aggregates LLC | Zephyrhill | 19.2 mi | 38.5 |
| quarry | Four Corners | Lithia | 22.5 mi | 45.1 |
| quarry | South Pasture Mine | Lithia | 28.5 mi | 57.1 |
| quarry | Wingate Creek Mine | Lithia | 31.2 mi | 62.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 34.0 mi | 68.1 |
| quarry | South Fort Meade Mine | Lithia | 37.9 mi | 75.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2023301021 | 2026-07-04 | Open ↗ |
| official_records_noc | Hillsborough_2023193539 | 2026-07-04 | Open ↗ |
| official_records_noc | Hillsborough_2022284217 | 2026-07-04 | Open ↗ |
| official_records_noc | Hillsborough_2022231118 | 2026-07-04 | Open ↗ |
| official_records_noc | Hillsborough_2022171321 | 2026-07-04 | Open ↗ |
| official_records_noc | Hillsborough_2022141991 | 2026-07-04 | Open ↗ |
| official_records_noc | Hillsborough_2022078704 | 2026-07-04 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 071614-0000
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/iconstructors-llc-project-l-11-highwoods-preserve-ph-1-replat-hillsborough-fl-485712a1