Leads/hvac-replacement-equal-ac-change-out-3-ton-no-electrical-upgrades-hillsborough-f-6611202b
Approved · unknownHillsborough County

HVAC Replacement - equal ac change out 3 ton. no electrical upgrades.

1905 E 111th Ave, T, 33612

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

HVAC Replacement - equal ac change out 3 ton. no electrical upgrades.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
A&G SERVICES HVAC AND PLUMBING INC
Developer / Applicant
Joseph And Mary C Bethane
Why this is a hauling opportunity: Base unknown/other (20) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-02TAMPA_ACCELA
    Captured BTR-26-0628530 from tampa_accela

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
7.8 mi
Round trip
15.6 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa7.8 mi15.6
quarryCentral State Aggregates LLCZephyrhill13.7 mi27.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 23.5 mi47
quarryCaloosa MaterialsRuskin23.9 mi47.8
sand pitCounty Line MineSpring Hill27.7 mi55.4
quarryFour CornersLithia34.6 mi69.2
quarryWest Florida AggregateWebster36.6 mi73.2
quarryBrooksville QuarryBrooksville36.9 mi73.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Joseph And Mary C Bethane
Contractor
A&G SERVICES HVAC AND PLUMBING INC
Applicant
A&G SERVICES HVAC AND PLUMBING INC

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
tampa_accelaBTR-26-06285302026-07-02Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
City
Tampa
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/hvac-replacement-equal-ac-change-out-3-ton-no-electrical-upgrades-hillsborough-f-6611202b