HOMES BY WEST BAY LLC project — 29-26-21
29-26-21
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-10PASCO_NOCCaptured Pasco_2026043519 from pasco_noc
- 2026-03-10PASCO_NOCCaptured Pasco_2026043520 from pasco_noc
- 2026-03-10PASCO_NOCCaptured Pasco_2026043521 from pasco_noc
- 2026-04-07PASCO_NOCCaptured Pasco_2026060960 from pasco_noc
- 2026-04-25PASCO_NOCCaptured Pasco_2026076301 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026081376 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026081377 from pasco_noc
- 2026-05-08PASCO_NOCCaptured Pasco_2026081378 from pasco_noc
- 2026-05-09PASCO_NOCCaptured Pasco_2026086897 from pasco_noc
- 2026-05-09PASCO_NOCCaptured Pasco_2026086898 from pasco_noc
- 2026-05-09PASCO_NOCCaptured Pasco_2026086899 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 4.1 mi | 8.2 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 20.7 mi | 41.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 22.0 mi | 44 |
| quarry | West Florida Aggregate | Webster | 22.4 mi | 44.9 |
| sand pit | County Line Mine | Spring Hill | 26.5 mi | 53 |
| quarry | Brooksville South Cement Plant | Brooksville | 29.7 mi | 59.5 |
| quarry | Brooksville Quarry | Brooksville | 29.9 mi | 59.8 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 31.3 mi | 62.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026043519 | 2026-03-10 | Open ↗ |
| pasco_noc | Pasco_2026043520 | 2026-03-10 | Open ↗ |
| pasco_noc | Pasco_2026043521 | 2026-03-10 | Open ↗ |
| pasco_noc | Pasco_2026060960 | 2026-04-07 | Open ↗ |
| pasco_noc | Pasco_2026076301 | 2026-04-25 | Open ↗ |
| pasco_noc | Pasco_2026081376 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026081377 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026081378 | 2026-05-08 | Open ↗ |
| pasco_noc | Pasco_2026086897 | 2026-05-09 | Open ↗ |
| pasco_noc | Pasco_2026086898 | 2026-05-09 | Open ↗ |
| pasco_noc | Pasco_2026086899 | 2026-05-09 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/homes-by-west-bay-llc-project-29-26-21-pasco-fl-fee948bf