QUALITY CRAFTSMEN LLC project — 03-26-21
03-26-21
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026082607 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2026064257 from pasco_noc
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_03-26-21-0000-49900-00B0_34e63d54 from fl_dor_cadastral
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_03-26-21-0000-49900-00B0_190f1ce8 from fl_dor_cadastral
- 2026-06-01PASCOPACaptured PASCOPA_03-26-21-0000-49900-00B0_34e63d54 from pascopa
- 2026-06-08PASCOPACaptured PASCOPA_03-26-21-0000-49900-00B0_190f1ce8 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 6.9 mi | 13.7 |
| quarry | West Florida Aggregate | Webster | 18.0 mi | 36.1 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 20.1 mi | 40.3 |
| sand pit | County Line Mine | Spring Hill | 25.9 mi | 51.9 |
| quarry | Tampa Cement Grinding Plant | Tampa | 26.4 mi | 52.9 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 26.8 mi | 53.6 |
| quarry | Brooksville South Cement Plant | Brooksville | 27.1 mi | 54.1 |
| quarry | Brooksville Quarry | Brooksville | 27.4 mi | 54.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026082607 | 2026-05-21 | Open ↗ |
| pasco_noc | Pasco_2026064257 | 2026-05-21 | Open ↗ |
| fl_dor_cadastral | FDOR_03-26-21-0000-49900-00B0_34e63d54 | 2026-05-28 | Open ↗ |
| fl_dor_cadastral | FDOR_03-26-21-0000-49900-00B0_190f1ce8 | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_03-26-21-0000-49900-00B0_34e63d54 | 2026-06-01 | Open ↗ |
| pascopa | PASCOPA_03-26-21-0000-49900-00B0_190f1ce8 | 2026-06-08 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 03-26-21-0000-49900-00B0
- Strap
- 03-26-21-0000-49900-00B0
- Address
- Acreage
- 6.06 ac
- Sq ft
- 263,974
No sale on record
- Just (market)
- $6,060
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/hersch-blake-project-03-26-21-pasco-fl-5fafbc5c