US SHINGLE AND METAL LLC project — 06-26-16
06-26-16
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026068784 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 16.3 mi | 32.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 17.9 mi | 35.8 |
| quarry | Central State Aggregates LLC | Zephyrhill | 27.3 mi | 54.6 |
| quarry | Tampa Cement Grinding Plant | Tampa | 28.4 mi | 56.8 |
| quarry | Brooksville Quarry | Brooksville | 29.2 mi | 58.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 30.0 mi | 60.1 |
| quarry | Calcium Plant | Jacksonville | 32.7 mi | 65.3 |
| quarry | Center Hill Mine | Brooksville | 36.6 mi | 73.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026068784 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/hansen-harry-project-06-26-16-pasco-fl-5f2f5483