HALLMARK TOWNHOUSES
115 S E ST, PENSACOLA, FL, 32502
- Filed
- Permitted
- Active
- Completed
Job closed — historical reference only
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21NPDES_STORMWATERCaptured FLR10RF40 from npdes_stormwater
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Devine Pit | CANTONMENT | 11.9 mi | 23.8 |
| sand pit | Quikrete Mine | MILTON | 16.9 mi | 33.7 |
| sand pit | River Road Pit | Navarre | 22.0 mi | 43.9 |
| sand pit | Molino Pit | Cantonment | 24.5 mi | 49.1 |
| sand pit | Shortleaf Borrow Pit | CANTONMENT | 33.0 mi | 66 |
| sand pit | G2C Sand Mine | Niceville | 47.2 mi | 94.5 |
| transfer station | PENSACOLA TRANSFER STATION | Pensacola | 2.2 mi | 4.3 |
| transfer station | ESCAMBIA COUNTY PALAFOX TRANSFER STATION | Pensacola | 2.4 mi | 4.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| npdes_stormwater | FLR10RF40 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- City
- PENSACOLA
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/hallmark-townhouses-fl-f62a2ccd