Leads/gonmax-construction-inc-project-24-26-15-pasco-fl-e40754b1
Approved · unknownPasco County

GONMAX CONSTRUCTION INC project — 24-26-15

24-26-15

Load estimate pending
Lifecycle
Permitted as of May 20, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

GONMAX CONSTRUCTION INC project — 24-26-15

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
GONMAX CONSTRUCTION INC
📞 (813) 284-0111
Developer / Applicant
JIMENEZ SARAY CABALLERO
The story

GONMAX Construction's site development project at 24-26-15 is in permit-issued stage with earthwork as the primary work class, representing a high-probability hauling opportunity (75/100 score). The project will require material movement and site preparation services, with GONMAX Construction as the prime GC and JIMENEZ SARAY CABALLERO as the owner/developer. Contact GONMAX Construction directly now while they're mobilizing—this is the optimal window to secure earthwork and debris hauling contracts before operations commence.

Why this is a hauling opportunity: General contractor NOC: GONMAX CONSTRUCTION INC | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026093922 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

No material sources within 50 mi. Coverage outside Florida is pending — see /material-sources.

Contact Graph

Who's involved and how

Developer
JIMENEZ SARAY CABALLERO
Contractor
GONMAX CONSTRUCTION INC
4 active projects · Hillsborough
~8 est. loads · fill dirt
📞 (813) 284-0111

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260939222026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/gonmax-construction-inc-project-24-26-15-pasco-fl-e40754b1