Leads/gogolin-luanne-project-sarasota-county-sarasota-fl-4c9c82e9
Approved · unknownSarasota County

GOGOLIN LUANNE project — Sarasota County

784 LONDRA DR VENICE

Load estimate pending
Lifecycle
Permitted as of Jun 1, 2023
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

GOGOLIN LUANNE project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
GOGOLIN LUANNE
Developer / Applicant
GOGOLIN DON
Why this is a hauling opportunity: NOC with no description — unknown scope | Connector base: 50 | Stage = permit_issued — actionable now (+10) | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2023088138 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
11.2 mi
Round trip
22.3 mi
TypeNameCityOne-wayRT mi
quarryFlorida Shell & Fill Company LLCNaples11.2 mi22.3
sand pitWashington Loop MinePunta Gorda30.2 mi60.3
quarryBermont Materials AlicoPunta Gorda31.6 mi63.3
quarryWingate Creek MineLithia33.3 mi66.7
quarry4M-31 MineAlva35.2 mi70.3
quarryHalls MineNaples40.8 mi81.5
sand pitWatermelon PitPunta Gorda41.0 mi81.9
quarryHighlands County Shell PitSebring41.7 mi83.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
GOGOLIN LUANNE
1 active project · Sarasota

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20230881382026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/gogolin-luanne-project-sarasota-county-sarasota-fl-4c9c82e9