Leads/generator-supercenter-of-tampa-bay-project-see-image-hillsborough-fl-3d626d69
Approved · unknownHillsborough County

NOC – Joe Villa | Generator Supercenter of Tampa Bay | 1008 I A JOLLA AVE

1008 I A JOLLA AVE, SUN CITY CENTER, FL 33573

Load estimate pending
Lifecycle
Permitted as of Aug 6, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Joe Villa | Generator Supercenter of Tampa Bay | 1008 I A JOLLA AVE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Parcel 054253-0000
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
GENERATOR SUPERCENTER OF TAMPA BAY
📞 (813) 488-6030
Developer / Applicant
VILLA JOE
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; INSTALL GENERAC GENERATOR WITH AUTOMATIC TRANSFER SWITCH INSTALL 22KW GENERATOR 250 GALLON JUG, LP TANK | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025341553 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
5.8 mi
Round trip
11.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin5.8 mi11.6
quarryTampa Cement Grinding PlantTampa15.8 mi31.5
quarryWingate Creek MineLithia20.7 mi41.4
quarryFour CornersLithia23.2 mi46.5
quarrySouth Pasture MineLithia25.1 mi50.1
quarryCentral State Aggregates LLCZephyrhill33.4 mi66.7
quarrySouth Fort Meade MineLithia36.6 mi73.3
quarry4M-31 MineAlva46.4 mi92.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
GENERATOR SUPERCENTER OF TAMPA BAY
11 active projects · Hillsborough
~23,151 est. loads · fill dirt
📞 (813) 488-6030

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20253415532026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
054253-0000
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/generator-supercenter-of-tampa-bay-project-see-image-hillsborough-fl-3d626d69