Leads/frix-dale-project-28-23-21-pasco-fl-0eef4bcd
Approved · unknownPasco County

QUALITY ROOFING project — 28-23-21

28-23-21

Load estimate pending
Lifecycle
Permitted as of Nov 12, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

QUALITY ROOFING project — 28-23-21

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
QUALITY ROOFING
Developer / Applicant
FRIX DALE
Why this is a hauling opportunity: NOC — unclassified description: 28-23-21 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025213692 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
West Florida Aggregate · Webster
One-way
5.9 mi
Round trip
11.8 mi
TypeNameCityOne-wayRT mi
quarryWest Florida AggregateWebster5.9 mi11.8
quarryCenter Hill MineBrooksville15.4 mi30.8
quarryBrooksville South Cement PlantBrooksville15.9 mi31.7
quarryBrooksville QuarryBrooksville16.6 mi33.1
quarryMid-Coast Aggregates LLC-Mazak MineWebster16.8 mi33.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.5 mi35.1
quarryCalcium PlantJacksonville18.0 mi36
quarryCentral State Aggregates LLCZephyrhill18.1 mi36.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
FRIX DALE
1 active project · Pasco
Contractor
QUALITY ROOFING
1 active project · Pasco

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20252136922026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/frix-dale-project-28-23-21-pasco-fl-0eef4bcd