Leads/frank-gay-services-project-33-24-16-pasco-fl-f6018302
Approved · unknownPasco County

FRANK GAY SERVICES project — 33-24-16

33-24-16

~38loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Mar 24, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FRANK GAY SERVICES project — 33-24-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$579K
Actual — from source record
Acreage
0.27 ac
Parcel 33-24-16-0120-00000-0710
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
FRANK GAY SERVICES
📞 (818) 275-8147
Developer / Applicant
KNIGHT DALLAS
Why this is a hauling opportunity: NOC — unclassified description: 33-24-16 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: (+6) | stage=permit_issued, recent (+10) | size signal: (+6) | stage=permit_issued, recent (+10) | size signal: $579,107 valuation, ~38 est. loads (+6) | stage=permit_issued, recent (+10) | size signal: $579,107 valuation, ~38 est. loads (+6) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026053787 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_33-24-16-0120-00000-0710_dc655df7 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_33-24-16-0120-00000-0710_dc655df7 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
10.0 mi
Round trip
20.1 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill10.0 mi20.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 13.4 mi26.8
quarryBrooksville QuarryBrooksville22.7 mi45.3
quarryBrooksville South Cement PlantBrooksville23.5 mi47.1
quarryCalcium PlantJacksonville25.9 mi51.9
quarryCentral State Aggregates LLCZephyrhill27.0 mi54
quarryCenter Hill MineBrooksville30.2 mi60.4
quarryTampa Cement Grinding PlantTampa32.9 mi65.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
KNIGHT DALLAS
Contractor
FRANK GAY SERVICES
6 active projects · Hillsborough
~38 est. loads · fill dirt
📞 (818) 275-8147

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260537872026-05-22Open ↗
fl_dor_cadastralFDOR_33-24-16-0120-00000-0710_dc655df72026-05-28Open ↗
pascopaPASCOPA_33-24-16-0120-00000-0710_dc655df72026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
33-24-16-0120-00000-0710
Strap
33-24-16-0120-00000-0710
Address
13419 LISA DRIVE, HUDSON
Zip
34667
Acreage
0.27 ac
Sq ft
11,761
Owner of record
KNIGHT DALLAS
Last sale

No sale on record

Appraiser valuation
Just (market)
$561,167

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/frank-gay-services-project-33-24-16-pasco-fl-f6018302