FDOT Resurfacing — WEBSTER TURN DR (Highlands Co.)
WEBSTER TURN DR FROM HAYWOOD TAYLOR BLVD TO BOEING AVE, Highlands County, FL
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Resurfacing project on Webster Turn Drive from Haywood Taylor Blvd to Boeing Ave in Highlands County, FL, is an approved public works initiative focused on roadway improvement. This project presents a significant hauling opportunity for providers, especially in earthwork and paving materials, as it has a high hauling score and is poised to begin in FY2024. Key contact for this project is C.W. Roberts Contracting, Inc., the prime general contractor, reachable at (813) 756-2009—it's advisable to establish connections early.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44636615401 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | South Fort Meade Mine | Lithia | 22.2 mi | 44.3 |
| sand pit | Diamond Sand Plant | Jacksonville | 28.1 mi | 56.2 |
| sand pit | Lake Wales Dry Plant | Davenport | 28.4 mi | 56.7 |
| sand pit | Lake Wales Sand Mine | Brooksville | 28.4 mi | 56.7 |
| quarry | 4M-31 Mine | Alva | 32.7 mi | 65.4 |
| quarry | South Pasture Mine | Lithia | 33.0 mi | 65.9 |
| quarry | Farabee Mine & Shell LLC | Punta Gorda | 36.9 mi | 73.8 |
| quarry | Four Corners | Lithia | 37.6 mi | 75.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44636615401 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Highlands
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-webster-turn-dr-highlands-co-highlands-fl-f20c84c8