Leads/fdot-resurfacing-us41-sr45-pasco-co-pasco-fl-bf5e5500
Active · punchlistPasco County

FDOT Resurfacing — US41/SR45 (Pasco Co.)

US41/SR45 FROM WASHINGTON LANE TO S OF COUNTY LINE ROAD, Pasco County, FL

Load estimate pending
Lifecycle
Filed as of Jan 1, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Paperwork in — not yet approved

Location

The workspace from above — satellite by default

FDOT Resurfacing — US41/SR45 (Pasco Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Pigott Asphalt and Sitework LLC
📞 (850) 926-4840
Developer / Applicant

Not yet identified

The story

FDOT is resurfacing approximately 10+ miles of US41/SR45 in Pasco County, FL, representing a significant roadway rehabilitation project scheduled for FY2027 with substantial asphalt and base material hauling requirements. This public works opportunity offers consistent demand for aggregate, recycled materials, and waste removal throughout the pre-construction and construction phases. Contact Pigott Asphalt and Sitework LLC (Prime GC: 850-926-4840) now to establish relationships and position your fleet for material staging, haul routes, and debris management contracts.

Why this is a hauling opportunity: FDOT resurfacing project, status: pre-const.underway, in Pasco County, FY2027, — early stage, build relationships now | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55) | FDOT public project (+15) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44793615201 from fdot_workprogram
  2. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44916515201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
West Florida Aggregate · Webster
One-way
10.4 mi
Round trip
20.8 mi
TypeNameCityOne-wayRT mi
quarryWest Florida AggregateWebster10.4 mi20.8
quarryCentral State Aggregates LLCZephyrhill12.8 mi25.6
quarryGeorgia Stone Spring Hill QuarryAtlanta 18.3 mi36.7
quarryMid-Coast Aggregates LLC-Mazak MineWebster20.1 mi40.1
quarryBrooksville South Cement PlantBrooksville21.1 mi42.2
quarryBrooksville QuarryBrooksville21.6 mi43.2
quarryCenter Hill MineBrooksville21.7 mi43.4
sand pitCounty Line MineSpring Hill23.6 mi47.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Pigott Asphalt and Sitework LLC
Paving
12 active projects · Alachua
📞 (850) 926-4840

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_447936152012026-03-08Open ↗
fdot_workprogramFDOTWP_449165152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-resurfacing-us41-sr45-pasco-co-pasco-fl-bf5e5500