FDOT Resurfacing — US 301/SR 43 (Hillsborough Co.)
US 301/SR 43 FROM MANATEE CO LINE TO S OF SR674/SUN CITY CENTER BLVD, Hillsborough County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT Resurfacing project on US 301/SR 43 in Hillsborough County, Florida, is focused on roadway improvements and is currently under construction. This project represents a significant opportunity for hauling providers, given its full scope in earthwork and materials movement crucial for roadway rehabilitation. Key contacts for this project include Preferred Materials Inc., the prime general contractor, reachable at (813) 973-2888.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_43983315201 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44342815A01 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44593615201 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44592015701 from fdot_workprogram
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44797215201 from fdot_workprogram
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 5.6 mi | 11.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 16.0 mi | 32 |
| quarry | Wingate Creek Mine | Lithia | 20.6 mi | 41.2 |
| quarry | Four Corners | Lithia | 23.4 mi | 46.8 |
| quarry | South Pasture Mine | Lithia | 25.1 mi | 50.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 33.7 mi | 67.3 |
| quarry | South Fort Meade Mine | Lithia | 36.7 mi | 73.5 |
| quarry | 4M-31 Mine | Alva | 46.2 mi | 92.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_43983315201 | 2026-03-08 | Open ↗ |
| fdot_workprogram | FDOTWP_44342815A01 | 2026-03-08 | Open ↗ |
| fdot_workprogram | FDOTWP_44593615201 | 2026-03-08 | Open ↗ |
| fdot_workprogram | FDOTWP_44592015701 | 2026-03-08 | Open ↗ |
| fdot_workprogram | FDOTWP_44797215201 | 2026-03-08 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-us-301-sr-43-hillsborough-co-hillsborough-fl-49319c68