Leads/fdot-resurfacing-us-19-sr-55-pinellas-co-pinellas-fl-d09aaf3e
Completed · completePinellas County

FDOT Resurfacing — US 19 (SR 55) (Pinellas Co.)

US 19/SR 55 FROM S OF CR 528/DREW ST TO N OFCR 576/SUNSET PT RD, Pinellas County, FL

Load estimate pending
Lifecycle
Active as of Jul 1, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

FDOT Resurfacing — US 19 (SR 55) (Pinellas Co.)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
Preferred Materials Inc.
📞 (813) 973-2888
Developer / Applicant

Not yet identified

The story

The FDOT resurfacing project along US 19 (SR 55) in Pinellas County involves significant roadway work currently under construction, making it a key opportunity for hauling providers to assist with the transport of materials and equipment. Given its high hauling score of 100/100, this public works project requires ongoing support for the earthwork and materials necessary to complete the resurfacing efficiently. Key contact for coordination is Preferred Materials Inc., the general contractor, reachable at (813) 973-2888.

Why this is a hauling opportunity: FDOT resurfacing project, status: under construction, in Pinellas County, FY2025, — active construction, hauling in progress | Connector base: 75 | FDOT/public project (+10) | Roadway/highway work (+10) | Keyword match: 1 categories (+5) | Stage = under_construction — actionable now (+10) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55) | FDOT public project (+15) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_44378015201 from fdot_workprogram
  2. 2026-03-08FDOT_WORKPROGRAM
    Captured FDOTWP_45605415201 from fdot_workprogram

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
20.5 mi
Round trip
41.1 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill20.5 mi41.1
quarryFour CornersLithia20.8 mi41.5
sand pitGator Sand MineBrooksville23.5 mi47.1
sand pitGreen Bay MineDavenport24.3 mi48.5
sand pitHaines City MineDavenport25.7 mi51.5
sand pit474 Sand MineBrooksville26.1 mi52.1
sand pitSILICA PLANTDavenport26.2 mi52.4
sand pitCypress SandLexington26.2 mi52.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Contractor
Preferred Materials Inc.
Aggregate / Pit
109 active projects · Pinellas
📞 (813) 973-2888
People (8)
  • KENNETH C · VPAS LAING
  • ROBERT F · PD DUKE
  • WILLIAM B · VPAS MILLER
  • CHARLIE · ST BROWN
  • eben@eyebytes.com✉︎
  • GARY P · AS HICKMAN
  • +2 more

Permits & Sources

Every connector that's seen this project

EARLY SIGNALFDOT Work Program(FDOT Work Program)

State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdot_workprogramFDOTWP_443780152012026-03-08Open ↗
fdot_workprogramFDOTWP_456054152012026-03-08Open ↗

Parcel Detail

Property records and ownership

Property
County
Pinellas
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

Award

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fdot-resurfacing-us-19-sr-55-pinellas-co-pinellas-fl-d09aaf3e