FDOT — AND SR 5 (US 1) FROM E OF I-95 TO US 1 AND FROM S OF
SR553/N PARK RD FROM US92/SR600/E BAKER ST TO N OF I4/SR400, Hillsborough County, FL
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The FDOT public works project involves roadway construction along SR 5 (US 1) from east of I-95 to US 1, as well as from south of SR 553/N Park Rd to north of I-4/SR 400 in Hillsborough County, FL, and is currently under construction. This project presents a significant hauling opportunity for providers due to its extensive earthwork and materials needs. Key contacts for the project include AJAX Paving Industries, Anderson Columbia Co., De Moya Contracting, and Preferred Materials, all of which are involved as general contractors and subcontractors.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-03-08FDOT_WORKPROGRAMCaptured FDOTWP_44166415201 from fdot_workprogram
- 2026-05-19FDOT_LETTINGCaptured CO_T7615 from fdot_letting
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 17.2 mi | 34.3 |
| quarry | Four Corners | Lithia | 19.6 mi | 39.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 21.4 mi | 42.9 |
| quarry | South Pasture Mine | Lithia | 27.6 mi | 55.3 |
| quarry | Caloosa Materials | Ruskin | 30.0 mi | 60.1 |
| sand pit | Gator Sand Mine | Brooksville | 30.6 mi | 61.1 |
| sand pit | Green Bay Mine | Davenport | 31.0 mi | 62 |
| sand pit | 474 Sand Mine | Brooksville | 32.3 mi | 64.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
State roadway project in the funding pipeline — huge volumes, long lead times, bid through prime contractors.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| fdot_workprogram | FDOTWP_44166415201 | 2026-03-08 | Open ↗ |
| fdot_letting | CO_T7615 | 2026-05-19 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/fdot-resurfacing-sr553-n-park-rd-hillsborough-co-hillsborough-fl-1a3c50c7